Henry HillDesign Build RenovateCall (314) 280-8020

Composite & PVC Decks in Cottleville, Missouri

If you are tired of sealing your Cottleville deck every other spring, composite ends that cycle. We help you pick a product and color suited to your sun exposure and build it to the manufacturer's specification so the warranty stands.

Section drawing through a two-story walkout home showing the parts of a house Henry Hill remodelsone contract, footing to ridgeAS-1Basement finishingBS-2KitchensCS-3BathroomsDS-4Decks & porchesES-5AdditionsFS-6Paint, floors & trimGS-7Siding, windows & doors
Service
Composite & PVC Decks
Community
Cottleville, St. Charles County
From Wentzville
About 22 min
Division
Decks & outdoor living

Cottleville homes and this kind of project

Because Cottleville is made up of newer custom and semi-custom homes, the first thing we check for a composite deck here is joist spacing, ledger flashing and footing depth on any frame we might reuse.

The housing stock here: newer custom and semi-custom two-stories and one-and-a-half stories, villa communities, and a handful of older homes in the original village.

Full-sun lots in new subdivisions call for lighter board colors that stay cooler.

Lots, exteriors and approvals in Cottleville

Covered patios, pavilions and screened porches are the favored projects, often with stone, a fireplace and an outdoor kitchen rough-in. Newer subdivisions have active architectural review, and materials usually need to match the house.

New subdivisions in Cottleville mean open lots, no shade and a small patio or deck from the builder. Owners are adding the outdoor space the builder left out: larger decks, roofed patios and privacy from the neighbors behind. HOA approval comes first.

What is included

For Cottleville composite decks we handle design, permit, frame construction or reinforcement, joist tape, hidden-fastener installation, picture framing, fascia, stairs, railing systems and optional low-voltage lighting.

We take on composite deck work across Cottleville, from the Village at Twin Creeks area to neighborhoods along Highway N and Weiss Road and Old Town Cottleville.

What we watch for

Older Cottleville deck frames were often built at twenty-four-inch joist spacing, which no composite manufacturer allows. Adding joists between the existing ones is routine for us.

Working on larger lots in recently built subdivisions, as we do in Cottleville, we plan access for deck carpenters before the first delivery arrives.

Permits and approvals in Cottleville

In Cottleville, a composite deck is reviewed by the City of Cottleville. What follows is a permit and inspections when the frame, stairs or guards change.

Exterior work in Cottleville can also involve active architectural committees that expect materials to match the house, and we put that package together for you.

Schedule and getting to you

On site, a composite deck in Cottleville generally runs one to three weeks.

Cottleville is down I-64 and across on Highway N, a bit over twenty minutes from our Wentzville base. We plan crew days and deliveries around that drive so you get full working days on site.

What our composite & pvc decks looks like

Photographs from jobs we have built. We do not label photographs by town, so these may or may not be near Cottleville; they are here so you can judge the standard of finish before we meet.

See every project in the set

What moves the price in Cottleville

We price composite & pvc decks in Cottleville from a site visit, not a square-foot figure. These are the items that change the number.

  • Railing system and linear footage.
  • Pattern complexity: borders, inlays, diagonal or herringbone layouts.

More detail

Our step-by-step method for this work, and the factors that move its price, are laid out on the main composite & pvc decks page. More about the area is on our Cottleville page.

Composite & PVC Decks in Cottleville: common questions

How long does a composite deck take in Cottleville?

One to three weeks. In Cottleville, permit review by the City of Cottleville and material lead times affect the start date more than our calendar does.

Do I need approval beyond a permit for a composite deck in Cottleville?

Possibly. In Cottleville you may be dealing with active architectural committees that expect materials to match the house. City or county approval and private approval are separate, and we prepare both submittals and wait for written approval before ordering materials.

Does composite get too hot?

Dark colors in direct afternoon sun do. Lighter colors and PVC lines run cooler. Shade from a pergola or umbrella helps more than product choice.

Tell us about the project

Call (314) 280-8020 during working hours, Monday to Friday, 9am to 5pm, or send the form and we will call you back. The first visit is a walkthrough and a conversation, and it costs nothing.

Call (314) 280-8020Request estimate