What typically requires approval
Decks, porches, patio covers, pergolas, fences, sheds, additions, exterior color changes, roofing material changes, siding replacement, front door changes and sometimes landscaping walls, play structures and solar panels. If it can be seen from outside, assume it needs approval until you have confirmed otherwise.
What to submit
A good package includes the items below. A complete application is approved faster than one that prompts questions.
- The association's application form
- A copy of your plat or survey with the structure drawn to scale and distances to lot lines shown
- Plan and elevation drawings with dimensions and height
- Materials and colors, with manufacturer names and samples or photos
- The contractor's name and insurance information
- The expected start date and duration
How long it takes
Indentures usually give the committee thirty days, sometimes forty-five. Many respond faster, but plan on the full period. Volunteer committees meet monthly in some neighborhoods. Submit in winter for spring construction.
Avoiding denial
Read the design guidelines before designing. Common sticking points are deck and railing colors, roofing that does not match the house, structures that cross a building line or easement, and sheds. Match the house: the same roof pitch, shingle and trim color go a long way with any committee.
Get it in writing
Keep the approval letter. A future buyer's title company or the HOA itself may ask for it, particularly if the board has turned over. We do not order materials for exterior projects until we have that letter in hand.
Related services
More guides
- Which remodeling projects need a permit in St. Charles County?
- Clay soil and wet basements: what to fix before you finish
- Pressure-treated, cedar, composite or PVC: choosing deck materials for Missouri weather
- A kitchen remodel, week by week
- How to vet a remodeling contractor in Missouri
- Remodel or move? A way to think it through
- What drives the cost of finishing a basement